Water System Sizing and Selection For Boreholes In Zimbabwe
Plenty Of Water Is, Plenty of Pressure is the time-honoured definition of an adequate private water system.
But this summary can be refined further and translated into specific quantities. Doing so requires familiarity with the basic criteria by which water systems performance is measured. Among these, the most important considerations include the following:
1. Total Demand: This is the sum of the water requirements of all users of the system, generally expressed as gallons per day (GPD). For residential jobs it is usually based on the number of occupants of the home.
The total demand for farm systems is often geared to the amount and kind of livestock. In the case of nonfarm, nonresidential installations, many different means are used for arriving at total demand.
2. Peak Demand: Rarely, if ever, is the total demand of a private water system spread equally over the day. In homes, for example, there are periods of peak demand — each lasting about an hour — in the morning and again in the evening.
Restaurants, farms, motels and most other water users likewise have periods of peak demand.
3. System Capacity: In order to function properly, the system must be able to meet the peak demand over the entire period during which it may be experienced.
Thus, the peak demand for a household lasts about an hour. If that demand is 30 GPM for a full hour, this means first that the pump must be capable of pumping at that rate. It also means that the well must be able to produce 30 GPM for a full hour.
ProWater Solutions: ProWater Solutions is the online hub or portal relating to everything on Borehole Drilling In Zimbabwe. We aim to be the go-to online hub of Borehole Drilling In Zimbabwe and assist other borehole companies by sharing our traffic and leads to them.
We have a substantial presence and experience in Borehole Siting, Borehole Drilling, Borehole Installation, and Solar Systems.
Standard Prices For Borehole Drilling
Borehole Siting (Geo-Survey)
Drilling & Casing (40m)
Standard Class 6 Casing included.
Premium Casing Upgrade
Upgrade to Class 9 Casing for extra durability.
Borehole Deepening / Extra Metres
For drilling beyond 40 metres.
Double Casing
For unstable ground conditions.
Tank & Tank Stand
5000 Litre Tank with a 4-metre Stand.
Disclaimer & Contact Information
ProWater Solutions makes no representations or warranties express or implied in relation to this website or the information and materials provided on this website. ProWater Solutions shall not be responsible for, and disclaims all liability for loss, injury, expense or damage (whether direct or consequential) of any nature whatsoever which may be suffered as a result of or which may be attributable, directly or indirectly, to the use of or reliance upon any information, links or services provided through this website. ProWater Solutions reserves the right to in its absolute discretion to modify, upgrade, update, suspend or withdraw this website or any part thereof at any time.
Request ProWater Solutions Services
ProWater Solutions links you to the best borehole drilling service providers in Zimbabwe. Contact us for FREE advice on your project: