Bulawayo City Council's Councillors Push For More Boreholes
Bulawayo City Councillors are considering using devolution funds to drill more boreholes to address the city’s perennial water crisis.
In 2019, the city suffered one of its worst water crises, during which 13 people died in Luveve's high-density suburb, while thousands were hospitalised after they drank contaminated water.
The situation did not get any better in 2020 after one of the city’s dams was decommissioned due to low water levels. The latest council minutes indicate that councillors have proposed that more boreholes be sunk.
Councillor Felix Mhaka is said to have suggested that the city has enough raw water sources, but pumping was the problem.
![]() |
Bulawayo City Councillors Push For More Boreholes |
“Councillor Mzamo Dube’s view was that the department of engineering services should investigate the availability of underground water,” the minutes read.
Councillor Silas Chigora supported the idea of borehole drilling and stressed the need to conserve water.
Councillor Edwin Ndlovu suggested that sites should be identified for new boreholes.
“Councillor Donaldson Mabutho noted that borehole water could be used for non-potable uses, in order to relieve pressure on treated piped water.”
However, deputy mayor Mlandu Ncube reminded councillors that the council’s mandate was to provide treated piped water to residents.
Ncube said it was not the council’s mandate to provide borehole water as its quality was not guaranteed. Councillor Febbie Msipa and Alderman Monica Lubimbi said water rationing had been introduced prematurely because the rainy season had not ended yet.
While the city has given assurances that the water supply is adequate to last until 2026, many have disputed the assertion.
While dams such as Insiza can last for years, Umzingwane may not. The dam could be decommissioned soon due to low water levels.
We have a substantial presence and experience in Borehole Siting, Borehole Drilling, Borehole Installation, and Solar Systems.
Standard Prices For Borehole Drilling
Borehole Siting (Geo-Survey)
Drilling & Casing (40m)
Standard Class 6 Casing included.
Premium Casing Upgrade
Upgrade to Class 9 Casing for extra durability.
Borehole Deepening / Extra Metres
For drilling beyond 40 metres.
Double Casing
For unstable ground conditions.
Tank & Tank Stand
5000 Litre Tank with a 4-metre Stand.
Disclaimer & Contact Information
ProWater Solutions makes no representations or warranties express or implied in relation to this website or the information and materials provided on this website. ProWater Solutions shall not be responsible for, and disclaims all liability for loss, injury, expense or damage (whether direct or consequential) of any nature whatsoever which may be suffered as a result of or which may be attributable, directly or indirectly, to the use of or reliance upon any information, links or services provided through this website. ProWater Solutions reserves the right to in its absolute discretion to modify, upgrade, update, suspend or withdraw this website or any part thereof at any time.
Request ProWater Solutions Services
ProWater Solutions links you to the best borehole drilling service providers in Zimbabwe. Contact us for FREE advice on your project: